Extensive Changes Planned for Abol Trail on Katahdin

The Abol Trail famed for going straight up the mountain without switchbacks is about to get switchbacks along with other changes as the trail is relocated as a result of a landslide. The estimated cost of the rerouting is $100,000.

This entry was posted in General and tagged , , . Bookmark the permalink.

Leave a Reply